Saturday, 12 December 2015

Broadrake Bunkbarn - Week 59 7th-13th Dec 2015

At the start of the week, a new home for the brew-up - the drying room to be, yet to be painted
and rules needed to be made...
this was taken at the end of the week so looking a little grubby
but it kept the floor clean upstairs for the 1st oiling on Monday and 2nd coat on Wednesday

Mid-week, Insitu came to start the wash room floor surface, priming and applying first coat - access denied - imperative that NOTHING goes in whilst it's drying
then a 2nd coat with the final colour mix - a limestone/grey/biege mix that looks good with the slate and white walls....the final sealant went in on Saturday - should be dry by Monday

The handles on the outside doors were fitted last week - thumb turn locks since some of these will be fire exit routes.


By the end of the week, possible to get upstairs to see the result - amazing!
The product is Marldon hard wax oil which is environmentally friendly
http://www.woodfloorsdirect.uk.com/accessories/coatings/marldon_intense_waxoil.html
 On Friday afternoon the joiners fitted the legs to the kitchen base units and positioned them roughly...

On Saturday, Mike makes a start on a bunkbed....


(pics will be added later of completed bunk)
and outside in the very cold garage, a start is made on priming and undercoating the skirting and door architraving - 7 done, 28 to go....4.8m lengths of 70mm*20mm square cut
it's much easier to paint standing up rather than crawling around on hands and knees...but that will HAVE to be done for the topcoat.


Broadrake Bunkbarn - Week 58 30th Nov - 4th Dec 2015

Apologies for the delay in getting this week finally uploaded - lots of significant changes, amidst challenging weather and 3 powercuts in 5 days, and internet loss a couple of times too.. 

This week sees great progress with the slate flooring with final sealing and clean up.

Slate edging goes into the drying room and the main entrance - tricky to the right side of the doorway where there is a very narrow return, so John has split the slate right down to fit...


dusty footprints from the wash room...it will be good to get that floor in too...

upstairs the wooden flooring continues across to over halfway
Ted makes a start on installing the thumb lock latches - a power cut on Monday afternoon meant he was fitting this one by headtorch!! 

flooring now almost across the whole room...
 and into the cupboards
another morning & flooring makes it all the way

 steps are made into the small room....will need some visible nosing on these since they match so well they are almost invisible....

after a final clear up of cardboard and a sweep out, the space looks amazing 



now ready for the oiling to be done early next week

the staircase will be measured up for glass....the view looking up should remain
 and the view looking down will be open, light and airy with the glass balustrading